Dropped Kerb Cost Calculator (2026 Prices)

Estimate the cost of getting a dropped kerb (vehicle crossover) installed in the UK, including council and contractor fees.

If your council asks for drawings or supporting documents, check the dropped kerb planning map checklist before ordering a block plan or site location plan.

1. Number of Kerb Stones

Most standard single driveways require 3 to 5 dropped kerb stones. A double driveway usually requires 5 to 7.

stones
1510

2. Application Fees & Traffic Management

£

Enter your council's published assessment or application fee. Current charges vary widely across the UK.

Create Instant PDF Site Location Plans

Official Ordnance Survey mastermaps for planning applications.

From just £7.95

Create Planning Map

Estimated Cost

Council Application Fee£300
Contractor Installation (5 stones)£1,500
Total Est. Cost£1,800

Disclaimer: This calculator provides an illustrative estimate using £300 per kerb unit. Actual quotes depend on width, footway construction, utilities, drainage and local highway rules. Your council may use its own contractor or require an approved or accredited contractor.

Get an OS map for a planning application

2026 cost guide

How much does a dropped kerb cost in the UK?

There is no single UK dropped kerb price. The total normally combines a council assessment or application fee, construction of the vehicle crossover, traffic management and any extra work needed around utilities, trees, drainage or street furniture. Use the calculator as a starting point, then replace its default council fee with the charge published by your highway authority.

What is included in a dropped kerb quote?

Cost itemWhat it coversWhy it varies
Council feeApplication, site assessment, administration or licence checksEach highway authority publishes its own process and charges
ConstructionLowered kerbs, transition units and strengthening the footway or vergeWidth, materials, pavement depth and contractor model
Traffic managementSigns, guarding, temporary lights or lane controlsRoad classification, traffic volume and working space
Additional worksMoving covers, signs or street furniture; drainage, tree or utility workSite constraints and third-party approvals

Current council cost examples

Examples checked in July 2026 show why a local quote matters:

  • Enfield lists a £301 application fee and construction at £339 per square metre.
  • Surrey lists a £383 non-refundable first-stage application charge.
  • West Sussex lists separate assessment and construction-licence fees.

These are examples, not national price bands. Fees can change and construction is quoted separately in many areas.

What usually increases the price?

  • Widening an existing crossover or installing more kerb units
  • A deep or heavily constructed footway that needs more excavation
  • Temporary traffic lights, parking suspension or controlled-road working
  • Moving a utility cover, streetlight, sign, tree or drainage feature
  • Building or altering the driveway and hardstanding inside the property
  • Separate planning drawings or permission where required

Do you need planning permission for a dropped kerb?

You need permission from the relevant highway authority before creating a vehicle crossover over a public footway. Planning permission is a separate question and may be required for a classified road, a flat or maisonette, work in a conservation area, removal of certain walls or other site-specific reasons.

The Planning Portal dropped-kerb guide directs applicants to their local authority for a vehicle-crossover licence. Check both the highway authority and local planning authority before paying a non-refundable fee or starting private driveway work.

Planning permission does not automatically grant highway approval, and highway approval does not remove the need for planning permission where it applies.

Dropped kerb application checklist

  1. 1Read the highway authority criteria before paying the application or assessment fee.
  2. 2Confirm that the proposed parking area is large enough and can be accessed safely.
  3. 3Check road classification, conservation restrictions, trees and nearby street furniture.
  4. 4Ask the planning authority whether separate planning permission is required.
  5. 5Prepare the site plan, dimensions, photographs or other documents requested locally.
  6. 6Wait for written approval and follow the authority's contractor and licence process.

If drawings are requested, use the dropped kerb planning-map checklist to decide whether you need a site location plan, block plan or more detailed access drawing.

Dropped kerb cost FAQs

How much does a dropped kerb cost in the UK in 2026?

There is no national fixed price. Budget for the council assessment or application fee, construction, traffic management and any additional utility, drainage or street-furniture work. Replace the calculator defaults with local published fees and contractor quotes.

How much does a standard five-stone dropped kerb cost?

The calculator gives an illustrative construction estimate based on five kerb units, but councils and contractors may price by width, square metre or a site-specific quotation. The pavement construction and traffic controls can matter more than the number of stones.

Do I need planning permission for a dropped kerb?

You always need to follow the highway authority vehicle-crossover process for a public footway. Separate planning permission may be needed for a classified road, flats, conservation constraints or associated works. Ask the relevant councils before applying.

Can I install a dropped kerb myself?

Normally no. The work affects the public highway and must follow the authority's construction, contractor and licensing rules. Some councils use their own contractor; others require an approved or appropriately accredited contractor.

Does a dropped kerb application need a site plan?

Requirements vary. Some authorities ask for an accurate diagram, dimensions or planning drawings, especially where planning permission is required. Check the local application checklist before ordering mapping.

How long does a dropped kerb application take?

Timelines vary from a few weeks for assessment to several months for approval, quotation and construction. Site constraints, planning permission, contractor availability and utility checks can extend the process.